Costing from dimensions
Enter length, width, height and paper spec. Sheet size, every layer weight, board weight and a quotable rate per box and per kg come out — with flute take-up handled properly.
For corrugated box manufacturers
BoxVyapar takes an order from a client, works out the kilograms of semi and craft it needs, walks it through every machine on your floor, and tells you what it actually cost — including the paper you threw away.
40 entries a month free · no card needed
A job keeps a single identity from the day it is ordered to the day it leaves your gate. Nothing is copied between sheets, so nothing can drift apart.
Material Planning
Printing Plan
Brown / Duplex only
Sheeter
Pasting
weighed here
Dye / Rotary
RS4 Printing
RS4 boxes only
Stitching
weighed here
Ready for Dispatch
The two conditional stages are decided by the box itself, not by a person remembering. The two weighed stages are what turn wastage from a guess into a number.
Enter length, width, height and paper spec. Sheet size, every layer weight, board weight and a quotable rate per box and per kg come out — with flute take-up handled properly.
Printing plan, sheeter, pasting, dye, RS4, stitching, dispatch. Printed boxes route through printing automatically; plain ones skip it. No copying rows between sheets.
Weigh the board after pasting and the box after stitching. The difference is your real loss, per order and per box, instead of a percentage somebody guessed years ago.
Every stage records when the job entered it. Late orders surface themselves, and a finished order can never be reported as stuck somewhere it has already left.
Reel challans, kaanta slip against invoice weight, kilograms allocated to specific orders, and finished boxes tracked across every godown.
Supervisors can run the floor or the billing, but only the owner deletes. Everything else becomes a request you approve, and every change is logged against a name.
Corrugation loses 5 to 12 per cent of its paper to trim, slotting and rejects. Put your own numbers in.
Recover a third of it
₹72,706
a year
BoxVyapar weighs the board after pasting and the box after stitching. The difference is your real wastage, per order — not an estimate. You cannot cut what you have never measured.
BoxVyapar started as a spreadsheet that actually ran a corrugation plant — thirty tabs, three forms, and a great deal of Apps Script. We took the arithmetic apart formula by formula and rebuilt it, keeping what the floor trusted and fixing what it had quietly got wrong.
That is why the details are right: GSM in kg/m², sheet area over 1550, sheets-per-box divided at stitching, semi and craft split against the liner as well as the flutes.
How it was builtSet up all your boxes, parties and godowns for free. You only meet the limit once you are actually trading.
Run your whole floor for 45 days. Everything on, nothing held back.
₹0 forever
For a factory running every order through the system.
₹2,499 + tax / month
The software watches the floor and tells you what is about to go wrong.
₹3,499 + tax / month
All plans include the production board, planning and stock. Prices exclude GST.
Set up your box masters this afternoon. The first forty entries a month are free, and nothing you record is ever locked away.